Brief: Kootenay Completes Ni 43-101 Technical Report Detailing 54 Moz At 284 Gpt Silver Mineral Resource Estimate At Columba Project, Recommences Extension Drilling
Kootenay Silver Inc KTN.V: KOOTENAY COMPLETES NI 43-101 TECHNICAL REPORT DETAILING 54 MOZ AT 284 GPT SILVER MINERAL RESOURCE ESTIMATE AT COLUMBA PROJECT, RECOMMENCES EXTENSION DRILLING Source text: ID:nCNWHDYz9a Further company coverage: KTN.V
Recent news on Kootenay Silver
See all newsBrief: Columba Drilling Returns 10 Meters Of 503 Gpt Silver, 0.1% Lead, 0.6% Zinc And 9.88 Meters Of 319 Gpt Silver, 0.1% Lead And 0.6% Zinc From The Columba Drill Program
Brief: Columba Drilling Returns 10 Meters Of 503 Gpt Silver, 0.1% Lead, 0.6% Zinc And 9.88 Meters Of 319 Gpt Silver, 0.1% Lead And 0.6% Zinc From The Columba Drill Program
Brief: Kootenay Silver Announces Closing Of Bought Deal Life Private Placement For Gross Proceeds Of C$18 Million
Brief: Kootenay Completes Ni 43-101 Technical Report Detailing 54 Moz At 284 Gpt Silver Mineral Resource Estimate At Columba Project, Recommences Extension Drilling
Brief: Drill Results From Columba Project Chihuahua In Mexico